News

We keep you inform
MS Enertech on field!!
18 de June, 2021

MS Enertech on field!!

We have recently carried out several visits to unique places such as central Ethiopia (civil works) or the desert of Egypt (geotechnics, topography and civil works), to very complex orography in the mountains of northern Spain (civil and electrical works) and to very hot areas in central Spain (rebars assembly and foundation concreting).

Read more
Parque Eolico MS Enertech Colombia
17 de May, 2021

MS ENERTECH COLOMBIA SAS news!

We are pleased to announce that our subsidiary in Colombia has closed the engineering phase for La Guajira I Wind Farm as we have just received the final formal approval from the owner and the local visa of the Project (foundation, civil works and collector system).

Read more
15 Aniversary MS Enertech
13 de April, 2021

MS Enertech, 15th anniversary!

As today, 15 years ago, MS Enertech was born. And he did so with the illusion and doubts of the youth of those who set in motion this idea. Gradually, experienced people were joining in who helped develop, expand, internationalize, diversify and maintain this exciting project that began as a development of new concepts of wind turbine foundations (in which MS Enertech was a pioneer in Spain with ribbed solutions, high plinth foundation, fatigue tests in grouts, optimizations of conventional foundations, etc...) and that after these 15 years have made the company one of the global benchmarks of civil and electric BoP engineering for wind farms.

Read more
Singular foundations solutions
22 de March, 2021

Singular foundations solutions

MS Enertech, your reliable specialized partner for wind farm singular foundations MS Enertech, as part of its services for civil and electrical BoP engineering for wind farms, keeps on developing improvements within foundation design, from standard ones to singular solutions. Some of the last cases are the concrete-tower foundation for Barrax and Chinchilla Wind Farms for GRUPO GESTACUR in central Spain and micropiled foundation for Magua and Hoya de Lucas Wind Farms of A in Canary Island with micropiles executed by KELLER. Pictures below show the progress of the construction for both sites.

Read more
 Full topographic survey, geotechnical/geophysical studies and civil-electrical engineering for wind farm in Egypt.
21 de March, 2021

Full topographic survey, geotechnical/geophysical studies and civil-electrical engineering for wind farm in Egypt.

We look again for novel solutions to give answers to deliver full topographic survey, geotechnical/geophysical surveys and electrical-civil BOP executive engineering to get the ready to build. 70 WTGs in Egypt

Read more
Most powered on-shore wind turbine in the world.
28 de February, 2021

Most powered on-shore wind turbine in the world.

We are again delighted to celebrate that the most powerful on-shore WTG worlwide will be soon tested in Spain, and we have participated in this amazing Project within foundation design. Thank you Gamesa for trusting MS Enertech for this amazing prototype.

Read more
R&D Wind Energy
31 de January, 2021

MS RDitech....are you ready?

New year, new company. MS Enertech launches MS RDitech, its technology and R&D branch. As a result of the fifht year in a row of continues important growing since the new Management Board started its command and redefined the strategy and the work methodology, #MSEnertech is proud to announce the birth of #MSDRitech, a new company focused on very specialized consultancy, high added value technical advisory and R&D projects for the wind sector, including intertidal and off-shore wind farms.

Read more
MS Enertech
15 de December, 2020

Design for the foundation of a WTG prototype operating at 5.8 MW

MS ENERTECH is proud to announce that it has just delivered to one of its clients an executive design for the foundation of a WTG prototype operating at 5.8 MW that will soon be installed in Spain.

Read more
Windfarm
2 de December, 2020

Tallest Wind Turbine in Spain.

We are delighted to celebrate that the tallest WTG in our country will be soon installed in Burgos, our home province, and we have participated in this amazing Project within foundation design. Thank you EDP Renewables for trusting #MSEnertech for the #QuintanillaII #windfarm.

Read more
BIM Model
12 de May, 2020

BIM methodology

Constantly developing new services for our clients, MS ENERTECH is proud to announce that has delivered its first project in Spain under BIM methodology, resulting in a better comprenhension for all the parties of the assembly procedure and construction activites and in an additional improvement of constructibility and value of our engineering.

Read more
MS Enertech Colombia SAS
12 de March, 2020

MS Enertech Colombia SAS

A few months after our first projects in Colombia, we MS ENERTECH are more than glad to announce the recent creation of our subsidiary MS ENERTECH COLOMBIA S.A.S. In this way we consolidate and improve the way we provide our services to our clients and their projects in the country.

Read more
MS Enertech UL Certification
5 de March, 2020

UL C3 Foundation Certification

MS ENERTECH gets from UL the certification of C3 solution for WTG foundation design.

Read more
Electrical Engineer Incorporation
15 de January, 2020

Electrical Engineer Incorporation

MS ENERTECH strengthens its electrical engineering department.

Read more
WIND FARM SUPERVISION
19 de November, 2019

WIND FARM SUPERVISION

MS ENERTECH INCREASES ITS SERVICES´ PORTFOLIO. Last month of September MS ENERTECH ended its works as Site Management and Supervision during Construction for 4 WFs in North of Spain, adding 30 WTGs. As part of this Project, and for the first time in the Company, we also oversaw and validated the assembly of the tower sections and the components of the WTG. We are really proud to see that our previous engineering becomes a high-quality reality in a few months.

Read more
Seismic Specialist
20 de September, 2019

Seismic Specialist

MS ENERTECH, your reliable seismic specialist, even more than before. We are proud to share with our clients that we are running many desings of foundation and civil works (slope stability, stone columns, piles, large-diameter slabs) in high seismic areas (India, Chile, Colombia) with different types of soil (liquefaction, flooding risk, collapse, very high slopes), which consolidates us as one of the main players for BoP engineering in the wind sector.

Read more